ENCO Engineers Combine Pvt. Ltd.
Weβre Hiring: Senior SQA Engineer (Supplier Quality Assurance)
π Location: Dharuhera, Haryana
π’ Company: ENCO Engineers Combine Pvt. Ltd.
π§© Experience: 4β7 Years (Auto Components Industry)
ENCO Engineers Combine Pvt. Ltd. is expanding its Supplier Quality & Development function and is looking for a highly skilled Senior SQA Engineer to strengthen our supply chain performance. If you are passionate about supplier audits, defect reduction, incoming quality improvement, and ensuring a zero-defect ecosystem, this opportunity is for you.
π§ Key Responsibilities
Conduct supplier process audits and review PFD, PFMEA, and Control Plans.
Validate PPAP, APQP, and complete supplier documentation.
Manage supplier non-conformities, drive CAPA implementation, and reduce defects.
Lead supplier improvement projects to enhance capability and quality compliance.
Monitor incoming quality performance, strengthen IQC systems, and support PPM improvement.
Collaborate closely with Purchase, Production, and Quality teams.
Manage supplier escalations and ensure timely issue closure and effectiveness.
π― Candidate Profile β What Weβre Looking For
4β7 years of experience in Supplier Quality Assurance within auto components manufacturing.
Strong knowledge of IATF 16949, PPAP, APQP, SPC, and MSA.
Exposure to machining, sheet metal, weld shop, or plastics processes.
Excellent analytical ability, communication skills, and vendor management capability.
Ability to drive supplier improvement initiatives independently.
π Why Join ENCO Engineers?
Opportunity to work on major OEM supply programs.
Exposure to advanced QMS and Supplier Development practices.
High-growth learning environment with strong cross-functional support.
Play a key role in building a robust, zero-defect supply chain.
π© How to Apply
Interested candidates can email their updated resume to:
π§ komal.saraswat@enco.inβ Top 10 Interview Questions & Detailed Answers β Sr. SQA Engineer
1. What is your approach when conducting a Supplier Process Audit?
Answer:
My process audit approach includes:
Preparation
Review past NCs, PPM history, audit reports, and process flow.
On-Site Study
Verify PFD, PFMEA, Control Plan alignment with actual practice.
Check machine capability, poka-yoke, traceability, maintenance records.
Validate operator training, WI, and material handling.
Gap Identification
Note deviations, risks, and systemic issues.
Audit Rating & NC Preparation
Categorize NCs as Major/Minor.
Follow-up
Ensure CAPA within timeline with effectiveness verification.
This ensures process capability, compliance, and defect prevention.
2. How do you validate a PPAP submission from a supplier?
Answer:
PPAP validation includes:
Reviewing Part Submission Warrant (PSW)
Checking DFMEA, PFMEA, Control Plan
Verifying Process Capability (Cp/Cpk) reports
Checking Dimensional report, Material/Performance tests, and IMDS
Verifying Gauge R&R
Ensuring MSA, SPC, and packaging standards
Checking sample parts and verifying them against drawing
Approval is given only if the submission meets OEM/IATF requirements and satisfies performance criteria.
3. How do you handle supplier rejections and NC/CAPA closure?
Answer:
Steps:
Immediate containment at supplier & incoming
Perform Root Cause Analysis (5 Why, Fishbone, Why-Why)
Define Corrective & Preventive Action
Verify implementation & effectiveness
Track PPM and ensure no repeat occurrence
Timely escalation to management if supplier delays CAPA or repeated NCs occur.
4. What actions do you take to reduce Supplier PPM?
Answer:
PPM reduction measures include:
Monthly supplier performance review
Strengthening incoming inspection standards
Implementing error-proofing at supplier
Ensuring SPC controls on critical parameters
Line revalidation and capability enhancement
Training suppliers on APQP & IATF requirements
Setting target-based improvement plans
Focus is on preventive quality rather than reactive inspection.
5. How do you evaluate a supplier’s Process Capability?
Answer:
I verify Cp/Cpk values for critical & significant characteristics:
Cp/Cpk β₯ 1.67 for critical characteristics
Cp/Cpk β₯ 1.33 for standard characteristics
If below target:
Identify cause β tooling issues, measurement error, machine wear
Implement corrective action (tool change, setup optimization)
Re-evaluate after improvements
Capability ensures stable and predictable output.
6. How do you ensure supplier documentation meets APQP requirements?
Answer:
I check:
PFD, PFMEA & Control Plan linkage
Special characteristics marking
Gauge selection & MSA status
SPC charts for key processes
Trial run data and packaging validation
Run@Rate results
APQP compliance ensures product readiness before SOP.
7. What is your approach for handling repeated supplier quality issues?
Answer:
Initiate Supplier Red Alert/Quality Hold
Conduct onsite deep-dive audit
Re-train supplier teams
Implement sorting + 100% inspection temporarily
Identify core systemic issues
Final closure only after capability studies and long-term fix
Focus on sustained improvement, not temporary correction.
8. What are common problems you face in machining or sheet metal supplier processes?
Answer:
Machining:
Tool wear, improper clamping
Incorrect cutting parameters
Variation in coolant
Dimension shift due to thermal conditions
Sheet Metal:
Springback issues
Weld penetration inconsistency
Burrs due to die wear
Thickness variation in raw material
SQA engineer must address these via tooling review, SPC setup, and revalidation.
9. How do you manage Incoming Quality Control (IQC)?
Answer:
Define AQL, sampling plan
Ensure instrument calibration
Verify material certificate, COA, COA
Maintain inspection records & traceability
Communicate rejections immediately to supplier
Implement skip-lot inspection for good-performing suppliers
IQC ensures right material at right quality.
10. Why is IATF 16949 important for Supplier Quality?
Answer:
Because it:
Maintains consistency in automotive quality systems
Ensures defect prevention
Focuses on risk-based thinking
Strengthens APQP, PPAP, SPC, MSA, and audit systems
Improves supplier capability and customer satisfaction
It is the backbone of maintaining a zero-defect supply chain.
To apply for this job email your details to komal.saraswat@enco.in
π Checkout These Career-Boost Kits
- π APQP Document 100+ β Click Here
- π Production PPC 90+ Documents PPT β Click Here
- π Six Sigma Format β Click Here
- π― Dream Job Kit β Click Here
- π 60+ PPT Pack β Click Here
- ποΈ HR Formats 100000+ β Click Here
- β ISO 9001:2015 Toolkit β Click Here
- βοΈ IATF (AβZ All Formats) β Click Here
- π Resume Templates 700+β Click Here


